{"schema":"sb.node.v1","id":"sb:e/08414a82de8062ec3c1cbc6e","kind":"entity","label":{"text":"lg energy solution","locale":"en"},"identity":{"anchor":"label:en:lg energy solution","strength":"label"},"asOf":{"knowledgeCutoff":"2026-10-08T20:34:57.810068+00:00","snapshot":"deploy 04403dd1b6ff6ffe00b03195c3da75dd204003f6"},"lens":{"kind":"public"},"build":{"plane":"projected","builtFrom":["entity_graph.slim.json","entity_receipts (deploy asset)","event_graph.json","truth_records (deploy asset)","corroborated_record.json"],"rule":"node-projection.entity@v1"},"standing":{"evidence":{"supporting":126,"separatePublishers":21,"basis":"documents that mention the subject and the outlets that carried them; a mention is evidence the referent is in use, not evidence about any claim"},"admission":{"state":"canonical","reason":"entity graph provenance 'curated'; the node carries no promotion receipt in v1","policy":"EQ-PROMOTION (receipt not carried)"},"disposition":{"state":"served","reason":"public record"},"validity":{"from":"2026-09-03","to":"2026-10-08","basis":"first and last day we saw it mentioned; not the subject's own lifetime"},"measurement":{"state":"partial","blind":["assertion coverage 0.294: about 71% of mentions carry no typed assertion"]}},"dimensions":{"domains":["south_korea","battery_storage"],"activeDays":28,"assertions":{"econ-release":25,"launch-release":5,"rate-decision":4,"ipo-listing":2,"treaty-agreement":1}},"up":[],"upNote":"An entity is a root: it is contained by nothing. Pan out by following R.","children":{"count":12,"byKind":{"observation":12},"items":[{"id":"sb:o/6c0d610cfe7521b6b9f21157","kind":"observation","label":"electrive.com · 2026-10-05 · LG Energy Solution signs MoU with US startup Indigotech","url":"https://www.electrive.com/2026/10/05/lg-energy-solution-signs-mou-with-us-startup-indigotech/"},{"id":"sb:o/62f29fa58f068580607a7a97","kind":"observation","label":"electrive.com · 2026-10-03 · LG Energy Solution to supply 46,100 round cells to Mercedes","url":"https://www.electrive.com/2026/10/03/lg-energy-solution-to-supply-46100-round-cells-to-mercedes/"},{"id":"sb:o/76a8a6203588557d46cbcd0d","kind":"observation","label":"Best Magazine · 2026-10-02 · LG Energy Solution targets commercial EVs with indiGOtech","url":"https://www.bestmag.co.uk/lg-energy-indigotech-target-commercial-evs/"},{"id":"sb:o/eaedab6107220865fd722355","kind":"observation","label":"Seoul Economic Daily · 2026-09-30 · LG Energy Solution to Build World's First Prismatic LMR Battery Line in Tennessee","url":"https://en.sedaily.com/finance/2026/09/30/lg-energy-solution-to-build-worlds-first-prismatic-lmr"},{"id":"sb:o/0e4c4b49725611353e8aa4ce","kind":"observation","label":"Energy Storage News · 2026-09-29 · LG Energy Solution partners with B2U Storage for second life US BESS projects","url":"https://www.energy-storage.news/lg-energy-solution-partners-with-b2u-storage-for-second-life-us-bess-projects/"},{"id":"sb:o/5e01ab203c58c2f34ae28c0d","kind":"observation","label":"Saur Energy · 2026-09-22 · LG Energy Solution’s New BESS Qualification Opens Door to AI Data Centre Market","url":"https://www.saurenergy.com/solar-energy-news/why-nvidias-dsx-ready-qualification-matters-for-lg-energy-solutions-bess-12562620"},{"id":"sb:o/c25bedda41bcd90c7ad66ba3","kind":"observation","label":"Best Magazine · 2026-09-22 · LG Energy Solution BESS gains NVIDIA qualification","url":"https://www.bestmag.co.uk/lg-energy-solution-bess-gains-nvidia-approval/"},{"id":"sb:o/31ce77daee9b7b0b5a843b1f","kind":"observation","label":"electrive.com · 2026-09-09 · LG Energy Solution reports progress in LMR batteries","url":"https://www.electrive.com/2026/09/09/lg-energy-solution-reports-progress-in-lmr-batteries/"},{"id":"sb:o/5402e753c8f1479a219f0f79","kind":"observation","label":"electrive.com · 2026-09-03 · LG Energy Solution secures US lithium supply for ten years","url":"https://www.electrive.com/2026/09/01/lg-energy-solution-secures-us-lithium-supply-for-ten-years/"},{"id":"sb:o/7070dc345b49ed109ef28f33","kind":"observation","label":"Korea Times · 2026-10-08 · Seoul shares down for 3rd day amid inflation worries","url":"https://www.koreatimes.co.kr/economy/20261008/seoul-shares-down-for-3rd-day-amid-inflation-worries?utm_source=rss"}],"cursor":"c1.eyJpZCI6InNiOmUvMDg0MTRhODJkZTgwNjJlYzNjMWNiYzZlIiwibCI6ImNoaWxkcmVuIiwibyI6MTAsImsiOm51bGwsImEiOiIyMDI2LTEwLTA4VDIwOjM0OjU3LjgxMDA2OCswMDowMCJ9","order":"newest first; we keep the 12 newest receipts for this entity. Its other observations are counted in standing.evidence.supporting but are not addressable in v1"},"relations":{"count":{"state":"cannot-measure","reason":"claims: this subject's maintained record could not be read (the maintained record \"lg-energy-solution\" could not measure its claims: this subject was retired from the publication registry on 2026-09-20 (no longer clears the admission conditions — re-checked 2026-09-20 (no receipt in the corpus-evidence shard for this label)); the record is kept as a dated tombstone and is no longer maintained). The items listed come from the passes that could be read"},"byKind":{"co-mentioned":10},"items":[{"kind":"relation","label":"co-mentioned with seoul (81 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/d299fa362e02376d7657f859"},{"kind":"relation","label":"co-mentioned with sk hynix (80 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/14c289bae6165bc9fbc5770b"},{"kind":"relation","label":"co-mentioned with samsung electronics (77 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/6f55ef6047d965109dca159b"},{"kind":"relation","label":"co-mentioned with kospi (75 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/24703265775ad1cc7c5efcd4"},{"kind":"relation","label":"co-mentioned with cpi (72 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/8925ed4b108aab7e1bea2f6f"},{"kind":"relation","label":"co-mentioned with korea composite stock (71 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/2852e841cfeea92518294b94"},{"kind":"relation","label":"co-mentioned with u.s. dollar (69 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/70722ab0b47747cd27758634"},{"kind":"relation","label":"co-mentioned with hyundai motor (68 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/86280f6e9850dc471537a57b"},{"kind":"relation","label":"co-mentioned with oil (63 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/30da83032181060e3e20c88d"},{"kind":"relation","label":"co-mentioned with oil prices (55 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/9f4935fbb873a30df22b5b1d"}],"cursor":null,"order":"situations first, then claims (the subject's own maintained record, then site-wide corroborated clusters; each label ends with its standing), then co-mentions by shared documents, descending. Co-mentions are the ten strongest the entity graph keeps per entity"},"edge":{"state":"continues"},"links":{"rest":"/api/v1/node/e/08414a82de8062ec3c1cbc6e","mcp":"traverse {\"id\":\"sb:e/08414a82de8062ec3c1cbc6e\"}","page":"/entity/lg-energy-solution/"},"limits":{"levelsPerCall":1,"pageSize":10,"maxPageSize":50,"membersMax":50,"statement":"One level per call: depth is 1 and only 1, and there is no whole-graph dump. pageSize 1-50 (default 10); a page limit is a cursor, never an edge. Members are listed up to 50. At most 60 traverse calls a minute per caller (runaway-loop protection, not a meter). One knowledge cutoff is served: the deploy's."},"actions":[{"verb":"unfold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/08414a82de8062ec3c1cbc6e\",\"level\":\"children\"}"},{"verb":"fold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/08414a82de8062ec3c1cbc6e\"}"},{"verb":"panOut","lit":false,"effect":"read","layer":"cantina","reason":"An entity is a root: it is contained by nothing. Pan out by following R."},{"verb":"follow","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/08414a82de8062ec3c1cbc6e\",\"level\":\"relations\"}"},{"verb":"receipts","lit":false,"effect":"read","layer":"cantina","reason":"receipts are the observations below this node; unfold to reach them"},{"verb":"edge","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/08414a82de8062ec3c1cbc6e\"}"},{"verb":"asOf","lit":false,"effect":"read","layer":"cantina","reason":"v1 serves one knowledge cutoff, this deploy's; walking an earlier cutoff needs retained history (EQ-REPLAY), which v1 does not keep"},{"verb":"switchObserver","lit":false,"effect":"read","layer":"cantina","reason":"the public record is the same for every observer; traversal through a Watch's lens is not served in v1"},{"verb":"readOriginal","lit":false,"effect":"read","layer":"cantina","reason":"no translation is applied on this node; every label is the source's own text"},{"verb":"save","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"saving applies to a configured Watch; configure one around this node first (free), then save it"},{"verb":"deliver","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"delivery applies to a saved Watch"},{"verb":"format","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"output format applies to a saved Watch"},{"verb":"deltaR","lit":false,"effect":"read","layer":"workshop","reason":"Delta R needs a saved Watch with a previous reading"},{"verb":"read","lit":false,"effect":"read","layer":"docking-bay","reason":"one-time Reads are parked until the Commander decides their shape (#938)"}]}