{"schema":"sb.node.v1","id":"sb:e/3a95176cca7882f61e15fd5d","kind":"entity","label":{"text":"aemo","locale":"en"},"identity":{"anchor":"label:en:aemo","strength":"label"},"asOf":{"knowledgeCutoff":"2026-10-08T15:58:04.276991+00:00","snapshot":"deploy dd8fb6da4473490c71337bbbe1a399a6a221fac3"},"lens":{"kind":"public"},"build":{"plane":"projected","builtFrom":["entity_graph.slim.json","entity_receipts (deploy asset)","event_graph.json","truth_records (deploy asset)","corroborated_record.json"],"rule":"node-projection.entity@v1"},"standing":{"evidence":{"supporting":24,"separatePublishers":7,"basis":"documents that mention the subject and the outlets that carried them; a mention is evidence the referent is in use, not evidence about any claim"},"admission":{"state":"canonical","reason":"entity graph provenance 'curated'; the node carries no promotion receipt in v1","policy":"EQ-PROMOTION (receipt not carried)"},"disposition":{"state":"served","reason":"public record"},"validity":{"from":"2026-09-04","to":"2026-10-07","basis":"first and last day we saw it mentioned; not the subject's own lifetime"},"measurement":{"state":"partial","blind":["assertion coverage 0.167: about 83% of mentions carry no typed assertion"]}},"dimensions":{"domains":["battery_storage","australia"],"activeDays":17,"assertions":{}},"up":[],"upNote":"An entity is a root: it is contained by nothing. Pan out by following R.","children":{"count":12,"byKind":{"observation":12},"items":[{"id":"sb:o/abcafb7695855327df40d712","kind":"observation","label":"Energy Storage News · 2026-09-25 · AEMO connects record 9.1GW of renewables and storage to Australia’s NEM in FY26, warns reliability depends on timely investment","url":"https://www.energy-storage.news/aemo-connects-record-9-1gw-of-renewables-and-storage-to-australias-nem-in-fy26-warns-reliability-depends-on-timely-investment/"},{"id":"sb:o/ab075ef2e6ba636d6c973cb8","kind":"observation","label":"Energy Storage News · 2026-09-21 · 554MW of battery storage enters AEMO’s Market Management System in Australia","url":"https://www.energy-storage.news/554mw-of-battery-storage-enters-aemos-market-management-system-in-australia/"},{"id":"sb:o/e4124629ac9ddfb838de8b36","kind":"observation","label":"Oxford Economics · 2026-10-07 · Data centres: A construction boom meets an infrastructure constraint","url":"https://www.oxfordeconomics.com/resource/data-centres-a-construction-boom-meets-an-infrastructure-constraint/"},{"id":"sb:o/2ac5115b1e3f95086af8df20","kind":"observation","label":"Energy Storage · 2026-10-06 · Aula Energy plans 1.8 GWh BESS for 330 MW of solar in Australia","url":"https://www.ess-news.com/2026/10/06/aula-energy-plans-1-8-gwh-bess-for-330-mw-of-solar-in-australia/"},{"id":"sb:o/1e2448d56a2bd30b8112132e","kind":"observation","label":"ABC News AU business · 2026-10-03 · Australia's power supply forecasts have never been rosier. Experts are worried","url":"https://www.abc.net.au/news/2026-10-03/aemo-under-fire-over-rose-tinted-power-reliability-forecasts/107189716"},{"id":"sb:o/9caac4d105de3b88e40a6eec","kind":"observation","label":"Energy Storage · 2026-10-01 · Energy Vault secures approval for 1 GWh, eight-hour battery in Australia","url":"https://www.ess-news.com/2026/10/01/energy-vault-secures-approval-for-1-gwh-eight-hour-battery-in-australia/"},{"id":"sb:o/e4140babf33d3378a5285fed","kind":"observation","label":"Energy Storage · 2026-09-30 · Australian home battery installs break more records","url":"https://www.ess-news.com/2026/09/29/australian-home-battery-installs-break-more-records/"},{"id":"sb:o/6e790dac416d93f8703d42c7","kind":"observation","label":"ABC News AU business · 2026-09-28 · SA's statewide blackout was 10 years ago — but electricity debate is still live","url":"https://www.abc.net.au/news/2026-09-28/sa-statewide-electricity-blackout-10-year-anniversary/107191400"},{"id":"sb:o/04a0501a29c76c66d748d72f","kind":"observation","label":"Energy Storage · 2026-09-28 · Australia’s 850 MW Waratah battery reaches full operations","url":"https://www.ess-news.com/2026/09/28/australias-850-mw-waratah-battery-reaches-full-operations/"},{"id":"sb:o/f2c5b13960eab373e36ea2ef","kind":"observation","label":"Energy Storage News · 2026-09-24 · Developers Valent, Akaysha advance 550MW of NEM-connected BESS in Victoria, Australia","url":"https://www.energy-storage.news/developers-valent-akaysha-advance-550mw-of-nem-connected-bess-in-victoria-australia/"}],"cursor":"c1.eyJpZCI6InNiOmUvM2E5NTE3NmNjYTc4ODJmNjFlMTVmZDVkIiwibCI6ImNoaWxkcmVuIiwibyI6MTAsImsiOm51bGwsImEiOiIyMDI2LTEwLTA4VDE1OjU4OjA0LjI3Njk5MSswMDowMCJ9","order":"newest first; we keep the 12 newest receipts for this entity. Its other observations are counted in standing.evidence.supporting but are not addressable in v1"},"relations":{"count":10,"byKind":{"co-mentioned":10},"items":[{"kind":"relation","label":"co-mentioned with australia (24 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/fddd67ab867f9d66cf004305"},{"kind":"relation","label":"co-mentioned with renewable energy (16 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/64f3ccac2b596d6e922808c3"},{"kind":"relation","label":"co-mentioned with australian energy market (15 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/50607b0980e921b0e025cc4e"},{"kind":"relation","label":"co-mentioned with battery storage (13 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/d71585fd5b660b88def3d665"},{"kind":"relation","label":"co-mentioned with bess (12 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/04d1853a18cf10fc26a14346"},{"kind":"relation","label":"co-mentioned with national electricity market (12 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/fc415f2aca0265e984e0fab5"},{"kind":"relation","label":"co-mentioned with wales (12 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/a0d170f9429d9e65bb325aa9"},{"kind":"relation","label":"co-mentioned with continue reading (11 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/390836477855d319bf878618"},{"kind":"relation","label":"co-mentioned with get the latest (11 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/08f34b27fffcc85e1898614a"},{"kind":"relation","label":"co-mentioned with victoria (10 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/df816d35f0ae15e51682f719"}],"cursor":null,"order":"situations first, then claims (the subject's own maintained record, then site-wide corroborated clusters; each label ends with its standing), then co-mentions by shared documents, descending. Co-mentions are the ten strongest the entity graph keeps per entity"},"edge":{"state":"continues"},"links":{"rest":"/api/v1/node/e/3a95176cca7882f61e15fd5d","mcp":"traverse {\"id\":\"sb:e/3a95176cca7882f61e15fd5d\"}","page":"/entity/aemo/"},"limits":{"levelsPerCall":1,"pageSize":10,"maxPageSize":50,"membersMax":50,"statement":"One level per call: depth is 1 and only 1, and there is no whole-graph dump. pageSize 1-50 (default 10); a page limit is a cursor, never an edge. Members are listed up to 50. At most 60 traverse calls a minute per caller (runaway-loop protection, not a meter). One knowledge cutoff is served: the deploy's."},"actions":[{"verb":"unfold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/3a95176cca7882f61e15fd5d\",\"level\":\"children\"}"},{"verb":"fold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/3a95176cca7882f61e15fd5d\"}"},{"verb":"panOut","lit":false,"effect":"read","layer":"cantina","reason":"An entity is a root: it is contained by nothing. Pan out by following R."},{"verb":"follow","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/3a95176cca7882f61e15fd5d\",\"level\":\"relations\"}"},{"verb":"receipts","lit":false,"effect":"read","layer":"cantina","reason":"receipts are the observations below this node; unfold to reach them"},{"verb":"edge","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/3a95176cca7882f61e15fd5d\"}"},{"verb":"asOf","lit":false,"effect":"read","layer":"cantina","reason":"v1 serves one knowledge cutoff, this deploy's; walking an earlier cutoff needs retained history (EQ-REPLAY), which v1 does not keep"},{"verb":"switchObserver","lit":false,"effect":"read","layer":"cantina","reason":"the public record is the same for every observer; traversal through a Watch's lens is not served in v1"},{"verb":"readOriginal","lit":false,"effect":"read","layer":"cantina","reason":"no translation is applied on this node; every label is the source's own text"},{"verb":"save","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"saving applies to a configured Watch; configure one around this node first (free), then save it"},{"verb":"deliver","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"delivery applies to a saved Watch"},{"verb":"format","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"output format applies to a saved Watch"},{"verb":"deltaR","lit":false,"effect":"read","layer":"workshop","reason":"Delta R needs a saved Watch with a previous reading"},{"verb":"read","lit":false,"effect":"read","layer":"docking-bay","reason":"one-time Reads are parked until the Commander decides their shape (#938)"}]}