{"schema":"sb.node.v1","id":"sb:e/77f94c2ef0d2a6c8d7d47d51","kind":"entity","label":{"text":"holtec","locale":"en"},"identity":{"anchor":"label:en:holtec","strength":"label"},"asOf":{"knowledgeCutoff":"2026-10-08T15:58:04.276991+00:00","snapshot":"deploy 7e1a8471a23e0f1eb0285c67fee8a6f7d073739a"},"lens":{"kind":"public"},"build":{"plane":"projected","builtFrom":["entity_graph.slim.json","entity_receipts (deploy asset)","event_graph.json","truth_records (deploy asset)","corroborated_record.json"],"rule":"node-projection.entity@v1"},"standing":{"evidence":{"supporting":40,"separatePublishers":19,"basis":"documents that mention the subject and the outlets that carried them; a mention is evidence the referent is in use, not evidence about any claim"},"admission":{"state":"canonical","reason":"entity graph provenance 'curated'; the node carries no promotion receipt in v1","policy":"EQ-PROMOTION (receipt not carried)"},"disposition":{"state":"served","reason":"public record"},"validity":{"from":"2026-09-03","to":"2026-10-06","basis":"first and last day we saw it mentioned; not the subject's own lifetime"},"measurement":{"state":"partial","blind":["assertion coverage 0.45: about 55% of mentions carry no typed assertion"]}},"dimensions":{"domains":["nuclear_energy","auto","energy"],"activeDays":17,"assertions":{"ipo-listing":10,"utterance":2,"launch-release":2,"regulatory-approval":2,"acquisition":1,"meeting-visit":1}},"up":[],"upNote":"An entity is a root: it is contained by nothing. Pan out by following R.","children":{"count":10,"byKind":{"observation":10},"withheld":{"state":"withheld","count":2,"reason":"2 receipts withheld: no source link (the same rule the topic record applies)"},"items":[{"id":"sb:o/acebd374ca3faa68d2ea971b","kind":"observation","label":"Energies Media · 2026-10-06 · Holtec submits key safety report to NRC, advancing construction permit process for two SMR-300 reactors at Palisades site in Michigan","url":"https://energiesmedia.com/holtec-safety-report-smr-michigan/"},{"id":"sb:o/400865486488e7682ff9fcfd","kind":"observation","label":"Energies Media · 2026-09-27 · NRC grants Holtec exemption to begin early ground construction for Pioneer nuclear units at Palisades site in Michigan","url":"https://energiesmedia.com/nrc-holtec-nuclear-pioneer-palisades/"},{"id":"sb:o/061b581b7aa6522955936696","kind":"observation","label":"ConstructConnect News · 2026-09-19 · Holtec: NRC Exemption Allows Early Work on Two Planned Small Modular Reactors","url":"https://news.constructconnect.com/holtec-nrc-exemption-allows-early-work-on-two-planned-small-modular-reactors"},{"id":"sb:o/4fffd30d29a54f98660e9e7e","kind":"observation","label":"ANS Nuclear Newswire · 2026-09-18 · Massachusetts blocks Holtec from discharging Pilgrim water","url":"https://www.ans.org/news/2026-09-17/article-8397/massachusetts-blocks-holtec-from-discharging-pilgrim-water/"},{"id":"sb:o/fd68bc4cf7f971fc8b39c908","kind":"observation","label":"World Nuclear News · 2026-09-18 · Holtec postpones planned stock market launch","url":"https://www.world-nuclear-news.org/articles/holtec-postpones-market-launch"},{"id":"sb:o/c8d89ae60071e606d7c9bc13","kind":"observation","label":"World Nuclear News · 2026-09-17 · Holtec SMR project gets regulatory nod for early site work","url":"https://www.world-nuclear-news.org/articles/holtec-smr-project-gets-regulatory-nod-for-early-site-work"},{"id":"sb:o/3f3c7060bfc41caef40c2bb4","kind":"observation","label":"Law 360 Securities · 2026-09-17 · Holtec Nuclear Delays $750M IPO Citing Market Conditions","url":"https://www.law360.com/securities/articles/2526648?utm_source=rss&utm_medium=rss&utm_campaign=section"},{"id":"sb:o/a864cedf55c162258425b34a","kind":"observation","label":"ANS Nuclear Newswire · 2026-09-03 · Holtec SMR-300 testing facility progresses at INL","url":"https://www.ans.org/news/2026-09-01/article-8354/holtec-smr300-testing-facility-progresses-at-inl/"},{"id":"sb:o/21f154405c0f52b1e6aa56e9","kind":"observation","label":"World Nuclear News · 2026-09-03 · Fuel loading under way for Palisades restart, Holtec announces","url":"https://www.world-nuclear-news.org/articles/fuel-loading-under-way-for-palisades-restart-holtec-announces"},{"id":"sb:o/0e484479e07caf2eb3bd7493","kind":"observation","label":"Fortune · 2026-10-06 · Why Oura really pulled its IPO: Wall Street experts suspect valuation concerns, an insider cash-out, and an Apple-sized threat","url":"https://fortune.com/2026/10/06/why-did-oura-pull-its-ipo/"}],"cursor":null,"order":"newest first; we keep the 10 newest receipts for this entity. Its other observations are counted in standing.evidence.supporting but are not addressable in v1"},"relations":{"count":11,"byKind":{"claim":1,"co-mentioned":10},"items":[{"id":"sb:p/58721cdc6aef315f8cc62f65","kind":"claim","label":"Holtec submits key safety report to NRC, advancing construction permit process for two SMR-300 reactors at Palisades site in Michigan — single source","role":"named-in","relationKind":"claim","members":1},{"kind":"relation","label":"co-mentioned with nuclear (39 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/db558b5745976534ec82ab65"},{"kind":"relation","label":"co-mentioned with small modular reactor (17 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/7f06e49a96bad2ae180f8acd"},{"kind":"relation","label":"co-mentioned with ai (16 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/8b441ceb9dd84bd91d55d922"},{"kind":"relation","label":"co-mentioned with holtec nuclear (14 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/948cf59981f110347ff102dd"},{"kind":"relation","label":"co-mentioned with michigan (13 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/6d2580521e16babfb9ec02c3"},{"kind":"relation","label":"co-mentioned with power plant (13 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/5924f4152608d268414ad9dc"},{"kind":"relation","label":"co-mentioned with nuclear regulatory commission (12 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/158361c4ee47e269bcf8f36a"},{"kind":"relation","label":"co-mentioned with holtec international (11 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/93574b9055d2f5d595c1d9c6"},{"kind":"relation","label":"co-mentioned with nasdaq (11 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/d98c4662e5ce4efe510bbf12"}],"cursor":"c1.eyJpZCI6InNiOmUvNzdmOTRjMmVmMGQyYTZjOGQ3ZDQ3ZDUxIiwibCI6InJlbGF0aW9ucyIsIm8iOjEwLCJrIjpudWxsLCJhIjoiMjAyNi0xMC0wOFQxNTo1ODowNC4yNzY5OTErMDA6MDAifQ","order":"situations first, then claims (the subject's own maintained record, then site-wide corroborated clusters; each label ends with its standing), then co-mentions by shared documents, descending. Co-mentions are the ten strongest the entity graph keeps per entity"},"edge":{"state":"continues"},"links":{"rest":"/api/v1/node/e/77f94c2ef0d2a6c8d7d47d51","mcp":"traverse {\"id\":\"sb:e/77f94c2ef0d2a6c8d7d47d51\"}","page":"/entity/holtec/"},"limits":{"levelsPerCall":1,"pageSize":10,"maxPageSize":50,"membersMax":50,"statement":"One level per call: depth is 1 and only 1, and there is no whole-graph dump. pageSize 1-50 (default 10); a page limit is a cursor, never an edge. Members are listed up to 50. At most 60 traverse calls a minute per caller (runaway-loop protection, not a meter). One knowledge cutoff is served: the deploy's."},"actions":[{"verb":"unfold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/77f94c2ef0d2a6c8d7d47d51\",\"level\":\"children\"}"},{"verb":"fold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/77f94c2ef0d2a6c8d7d47d51\"}"},{"verb":"panOut","lit":false,"effect":"read","layer":"cantina","reason":"An entity is a root: it is contained by nothing. Pan out by following R."},{"verb":"follow","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/77f94c2ef0d2a6c8d7d47d51\",\"level\":\"relations\"}"},{"verb":"receipts","lit":false,"effect":"read","layer":"cantina","reason":"receipts are the observations below this node; unfold to reach them"},{"verb":"edge","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/77f94c2ef0d2a6c8d7d47d51\"}"},{"verb":"asOf","lit":false,"effect":"read","layer":"cantina","reason":"v1 serves one knowledge cutoff, this deploy's; walking an earlier cutoff needs retained history (EQ-REPLAY), which v1 does not keep"},{"verb":"switchObserver","lit":false,"effect":"read","layer":"cantina","reason":"the public record is the same for every observer; traversal through a Watch's lens is not served in v1"},{"verb":"readOriginal","lit":false,"effect":"read","layer":"cantina","reason":"no translation is applied on this node; every label is the source's own text"},{"verb":"save","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"saving applies to a configured Watch; configure one around this node first (free), then save it"},{"verb":"deliver","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"delivery applies to a saved Watch"},{"verb":"format","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"output format applies to a saved Watch"},{"verb":"deltaR","lit":false,"effect":"read","layer":"workshop","reason":"Delta R needs a saved Watch with a previous reading"},{"verb":"read","lit":false,"effect":"read","layer":"docking-bay","reason":"one-time Reads are parked until the Commander decides their shape (#938)"}]}