{"schema":"sb.node.v1","id":"sb:e/9b299ba300642c98104383cd","kind":"entity","label":{"text":"power purchase agreement","locale":"en"},"identity":{"anchor":"label:en:power purchase agreement","strength":"label"},"asOf":{"knowledgeCutoff":"2026-10-08T23:32:17.032179+00:00","snapshot":"deploy f53c83974898cc97526b6050ab92612cf967bfc1"},"lens":{"kind":"public"},"build":{"plane":"projected","builtFrom":["entity_graph.slim.json","entity_receipts (deploy asset)","event_graph.json","truth_records (deploy asset)","corroborated_record.json"],"rule":"node-projection.entity@v1"},"standing":{"evidence":{"supporting":187,"separatePublishers":68,"basis":"documents that mention the subject and the outlets that carried them; a mention is evidence the referent is in use, not evidence about any claim"},"admission":{"state":"canonical","reason":"entity graph provenance 'curated'; the node carries no promotion receipt in v1","policy":"EQ-PROMOTION (receipt not carried)"},"disposition":{"state":"served","reason":"public record"},"validity":{"from":"2026-09-03","to":"2026-10-08","basis":"first and last day we saw it mentioned; not the subject's own lifetime"},"measurement":{"state":"partial","blind":["assertion coverage 0.118: about 88% of mentions carry no typed assertion"]}},"dimensions":{"domains":["auto","battery_storage"],"activeDays":33,"assertions":{}},"up":[],"upNote":"An entity is a root: it is contained by nothing. Pan out by following R.","children":{"count":12,"byKind":{"observation":12},"items":[{"id":"sb:o/c939eb1d81858a869da56b51","kind":"observation","label":"Energies Media · 2026-09-27 · Google and VALOREM Group sign ten-year wind power purchase agreement to supply clean electricity in Finland","url":"https://energiesmedia.com/google-valorem-wind-power-finland/"},{"id":"sb:o/19d1b2a9dd6a5935823e8f8c","kind":"observation","label":"Energies Media · 2026-09-22 · S&P Global examines ENGIE-QTS power purchase agreement and data center energy demand trends in ERCOT","url":"https://energiesmedia.com/engie-qts-demand-data-center/"},{"id":"sb:o/09d6cf8ef6ffe93937d51534","kind":"observation","label":"Seoul Economic Daily · 2026-10-08 · Musk Hints at TSMC Role in Terafab, Sending Intel Down 5.7%","url":"https://en.sedaily.com/society/2026/10/08/musk-hints-at-tsmc-role-in-terafab-sending-intel-down-57"},{"id":"sb:o/5f3bf8b10dad59893eadf51b","kind":"observation","label":"Seoul Economic Daily · 2026-10-08 · Google Locks In 3.6 GW of Power as Big Tech Races for Electricity","url":"https://en.sedaily.com/finance/2026/10/08/google-locks-in-36-gw-of-power-as-big-tech-races-for"},{"id":"sb:o/658915dd1e569088fb598800","kind":"observation","label":"Energies Media · 2026-10-07 · Ørsted starts construction on 200-MW Blackwater Solar project in New Mexico","url":"https://energiesmedia.com/orsted-200-mw-blackwater-solar-new-mexico/"},{"id":"sb:o/16d25b95da88ef75e6905911","kind":"observation","label":"Energy Storage · 2026-10-07 · e-Storage to deliver 100 MW/200 MWh BESS for OX2 in Australia","url":"https://www.ess-news.com/2026/10/07/e-storage-to-deliver-100-mw-200-mwh-bess-for-ox2-in-australia/"},{"id":"sb:o/e3013775bd01a159157b8c93","kind":"observation","label":"citybiz · 2026-10-07 · Zelestra Tops $1 Billion in 2026 U.S. Financing With $350 Million Meta-Backed Solar Project","url":"https://www.citybiz.co/article/915204/zelestra-tops-1-billion-in-2026-u-s-financing-with-350-million-meta-backed-solar-project/"},{"id":"sb:o/1eae4d5e61faac5d41378b4a","kind":"observation","label":"Business Model Analyst · 2026-10-07 · Your Electric Bill Rents Power by the Year. Google Bought Decades.","url":"https://businessmodelanalyst.com/google-constellation-nuclear-uprate-20-year-term/"},{"id":"sb:o/33d809d73d52c5a92dc14428","kind":"observation","label":"ANS Nuclear Newswire · 2026-10-07 · State roundup: New developments in Midwest, New England","url":"https://www.ans.org/news/2026-10-07/article-8468/state-roundup-new-developments-in-midwest-new-england/"},{"id":"sb:o/b95286a67cc7967d49395448","kind":"observation","label":"Mining Technology · 2026-10-07 · Next-generation geothermal: borrowing oil and gas tech for the data centre boom","url":"https://www.mining-technology.com/news/next-generation-geothermal-oil-gas-tech-data-centre-boom/"}],"cursor":"c1.eyJpZCI6InNiOmUvOWIyOTliYTMwMDY0MmM5ODEwNDM4M2NkIiwibCI6ImNoaWxkcmVuIiwibyI6MTAsImsiOm51bGwsImEiOiIyMDI2LTEwLTA4VDIzOjMyOjE3LjAzMjE3OSswMDowMCJ9","order":"newest first; we keep the 12 newest receipts for this entity. Its other observations are counted in standing.evidence.supporting but are not addressable in v1"},"relations":{"count":10,"byKind":{"co-mentioned":10},"items":[{"kind":"relation","label":"co-mentioned with renewable energy (104 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/b19c14a6b7e5a6d7f22324bf"},{"kind":"relation","label":"co-mentioned with ai (66 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/306385bff117da686953ec7c"},{"kind":"relation","label":"co-mentioned with nuclear (62 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/df034c838bcf13f37079700c"},{"kind":"relation","label":"co-mentioned with google (54 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/0ffdc88cfdee3cc5a04224e5"},{"kind":"relation","label":"co-mentioned with battery energy storage (43 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/6f12304085daefad08a0d9c0"},{"kind":"relation","label":"co-mentioned with battery storage (39 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/7d73d6f49e78fc3abbc29b13"},{"kind":"relation","label":"co-mentioned with amazon (38 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/0ad4a4ba835edb10d18ac27b"},{"kind":"relation","label":"co-mentioned with texas (37 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/0caddad55cd6e12901b9296e"},{"kind":"relation","label":"co-mentioned with buy (35 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/2e398da76c406bc789eebb82"},{"kind":"relation","label":"co-mentioned with bess (34 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/319cfb2b8d7a47b098d79bea"}],"cursor":null,"order":"situations first, then claims (the subject's own maintained record, then site-wide corroborated clusters; each label ends with its standing), then co-mentions by shared documents, descending. Co-mentions are the ten strongest the entity graph keeps per entity"},"edge":{"state":"continues"},"links":{"rest":"/api/v1/node/e/9b299ba300642c98104383cd","mcp":"traverse {\"id\":\"sb:e/9b299ba300642c98104383cd\"}","page":"/entity/power-purchase-agreement/"},"limits":{"levelsPerCall":1,"pageSize":10,"maxPageSize":50,"membersMax":50,"statement":"One level per call: depth is 1 and only 1, and there is no whole-graph dump. pageSize 1-50 (default 10); a page limit is a cursor, never an edge. Members are listed up to 50. At most 60 traverse calls a minute per caller (runaway-loop protection, not a meter). One knowledge cutoff is served: the deploy's."},"actions":[{"verb":"unfold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/9b299ba300642c98104383cd\",\"level\":\"children\"}"},{"verb":"fold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/9b299ba300642c98104383cd\"}"},{"verb":"panOut","lit":false,"effect":"read","layer":"cantina","reason":"An entity is a root: it is contained by nothing. Pan out by following R."},{"verb":"follow","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/9b299ba300642c98104383cd\",\"level\":\"relations\"}"},{"verb":"receipts","lit":false,"effect":"read","layer":"cantina","reason":"receipts are the observations below this node; unfold to reach them"},{"verb":"edge","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/9b299ba300642c98104383cd\"}"},{"verb":"asOf","lit":false,"effect":"read","layer":"cantina","reason":"v1 serves one knowledge cutoff, this deploy's; walking an earlier cutoff needs retained history (EQ-REPLAY), which v1 does not keep"},{"verb":"switchObserver","lit":false,"effect":"read","layer":"cantina","reason":"the public record is the same for every observer; traversal through a Watch's lens is not served in v1"},{"verb":"readOriginal","lit":false,"effect":"read","layer":"cantina","reason":"no translation is applied on this node; every label is the source's own text"},{"verb":"save","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"saving applies to a configured Watch; configure one around this node first (free), then save it"},{"verb":"deliver","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"delivery applies to a saved Watch"},{"verb":"format","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"output format applies to a saved Watch"},{"verb":"deltaR","lit":false,"effect":"read","layer":"workshop","reason":"Delta R needs a saved Watch with a previous reading"},{"verb":"read","lit":false,"effect":"read","layer":"docking-bay","reason":"one-time Reads are parked until the Commander decides their shape (#938)"}]}