{"schema":"sb.node.v1","id":"sb:e/df6d722246c6ca4cfb11b40b","kind":"entity","label":{"text":"bess","locale":"en"},"identity":{"anchor":"label:en:bess","strength":"label"},"asOf":{"knowledgeCutoff":"2026-10-07T23:31:26.583504+00:00","snapshot":"deploy 572b020c443beb3e9d38f0aa51744ca1e24b0bb2"},"lens":{"kind":"public"},"build":{"plane":"projected","builtFrom":["entity_graph.slim.json","entity_receipts (deploy asset)","event_graph.json","truth_records (deploy asset)","corroborated_record.json"],"rule":"node-projection.entity@v1"},"standing":{"evidence":{"supporting":441,"separatePublishers":43,"basis":"documents that mention the subject and the outlets that carried them; a mention is evidence the referent is in use, not evidence about any claim"},"admission":{"state":"canonical","reason":"entity graph provenance 'curated'; the node carries no promotion receipt in v1","policy":"EQ-PROMOTION (receipt not carried)"},"disposition":{"state":"served","reason":"public record"},"validity":{"from":"2026-09-03","to":"2026-10-06","basis":"first and last day we saw it mentioned; not the subject's own lifetime"},"measurement":{"state":"partial","blind":["assertion coverage 0.17: about 83% of mentions carry no typed assertion"]}},"dimensions":{"domains":["battery_storage"],"activeDays":34,"assertions":{}},"up":[],"upNote":"An entity is a root: it is contained by nothing. Pan out by following R.","children":{"count":10,"byKind":{"observation":10},"withheld":{"state":"withheld","count":2,"reason":"2 receipts withheld: no source link (the same rule the topic record applies)"},"items":[{"id":"sb:o/6801dc1c6897098b22cce44c","kind":"observation","label":"Energy Storage News · 2026-10-06 · Maryland conditionally approves 440MW of BESS for state ‘Capacity Credit’ awards","url":"https://www.energy-storage.news/maryland-conditionally-approves-440mw-of-bess-for-state-capacity-credit-awards/"},{"id":"sb:o/7f27400aa4f35e790692c6ec","kind":"observation","label":"Energy Storage News · 2026-10-06 · Linea Energy closes financing for 500MWh Texas BESS project","url":"https://www.energy-storage.news/linea-energy-closes-financing-for-500mwh-texas-bess-project/"},{"id":"sb:o/9458661ba32eaa0c60afbf87","kind":"observation","label":"Saur Energy · 2026-10-06 · Jupiter Wagons Wins 102.5 MWh BESS Project in Uttarakhand; 200 MWh in West Bengal","url":"https://www.saurenergy.com/solar-energy-news/jupiter-wagons-wins-1025-mwh-bess-project-in-uttarakhand-200-mwh-in-west-bengal-12625938"},{"id":"sb:o/4591152194235935fc044490","kind":"observation","label":"Energy Storage · 2026-10-06 · India’s SECI seeks developers for 800 MW/3.2 GWh BESS","url":"https://www.ess-news.com/2026/10/06/indias-seci-seeks-developers-for-800-mw-3-2-gwh-bess/"},{"id":"sb:o/f53d8c95bcefb84531d1938b","kind":"observation","label":"Energy Storage · 2026-10-06 · EDP targets 350 MW of BESS in Sicily","url":"https://www.ess-news.com/2026/10/06/edp-targets-350-mw-of-bess-in-italy/"},{"id":"sb:o/425ec58ff1fbc1fb82dbf1ce","kind":"observation","label":"Energy Storage · 2026-10-06 · BW ESS, Danske Commodities sign 10-year optimization agreement on 857 MWh Berkswell BESS","url":"https://www.ess-news.com/2026/10/06/bw-ess-danske-commodities-sign-10-year-optimization-agreement-on-857-mwh-berkswell-bess/"},{"id":"sb:o/2ac5115b1e3f95086af8df20","kind":"observation","label":"Energy Storage · 2026-10-06 · Aula Energy plans 1.8 GWh BESS for 330 MW of solar in Australia","url":"https://www.ess-news.com/2026/10/06/aula-energy-plans-1-8-gwh-bess-for-330-mw-of-solar-in-australia/"},{"id":"sb:o/c5f8c3fe9a6bbe54ec5c2136","kind":"observation","label":"Energy Storage · 2026-10-05 · SMA secures first German certification for grid-forming BESS","url":"https://www.ess-news.com/2026/10/05/sma-secures-first-german-certification-for-grid-forming-bess/"},{"id":"sb:o/63cccf608d8ddf7408a5a550","kind":"observation","label":"Saur Energy · 2026-10-05 · SECI Issues 800 MW/3,200 MWh BESS Tender With 4-Hr Discharge Cycle","url":"https://www.saurenergy.com/solar-energy-news/seci-issues-800-mw3200-mwh-bess-tender-with-4-hr-discharge-cycle-12623973"},{"id":"sb:o/845a96f229dd847bfc5d1bcd","kind":"observation","label":"Saur Energy · 2026-10-05 · Indus Towers Taps Cygni Energy For Up To 1.5 GWh BESS Capacity for Telecom Sector","url":"https://www.saurenergy.com/solar-energy-news/indus-towers-taps-cygni-energy-for-up-to-15-gwh-bess-capacity-for-telecom-sector-12624587"}],"cursor":null,"order":"newest first; we keep the 10 newest receipts for this entity. Its other observations are counted in standing.evidence.supporting but are not addressable in v1"},"relations":{"count":14,"byKind":{"claim":4,"co-mentioned":10},"items":[{"id":"sb:p/7e13be3467d2ca0c65172ad1","kind":"claim","label":"Cabinet Approves ₹1.86L crore Green Energy Corridor-III Scheme with 50 GWh BESS — corroborated","role":"named-in","relationKind":"claim","members":1},{"id":"sb:p/07863c6f780fcced52f8b7a0","kind":"claim","label":"Canada’s Northland Power closes financing on 1.2GWh of CM-contracted BESS projects in Poland — corroborated","role":"named-in","relationKind":"claim","members":1},{"id":"sb:p/ad534f4d1610d7e02f327d33","kind":"claim","label":"Linea Energy closes debt financing and preferred equity for 250 MW / 500 MWh Texas battery project — corroborated","role":"named-in","relationKind":"claim","members":1},{"id":"sb:p/6db17811fcf9389c5e380680","kind":"claim","label":"ACME Solar Commissions Additional 66.68 MW of 300 MW Rajasthan Project — corroborated","role":"named-in","relationKind":"claim","members":1},{"kind":"relation","label":"co-mentioned with battery energy storage (322 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/ee918523126bfdf3ec1abfbf"},{"kind":"relation","label":"co-mentioned with renewable energy (206 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/8cc91a051f036000afc9fcc5"},{"kind":"relation","label":"co-mentioned with battery storage (193 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/01d40e20f3fdac3f5a77c007"},{"kind":"relation","label":"co-mentioned with continue reading (131 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/8d730b59756901505ef0b396"},{"kind":"relation","label":"co-mentioned with europe (90 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/a7a6c66464e850998f5b6801"},{"kind":"relation","label":"co-mentioned with ai (75 documents)","role":"co-mentioned","relationKind":"co-mentioned","members":2,"id":"sb:r/b5337aa6ef0b985e7b756904"}],"cursor":"c1.eyJpZCI6InNiOmUvZGY2ZDcyMjI0NmM2Y2E0Y2ZiMTFiNDBiIiwibCI6InJlbGF0aW9ucyIsIm8iOjEwLCJrIjpudWxsLCJhIjoiMjAyNi0xMC0wN1QyMzozMToyNi41ODM1MDQrMDA6MDAifQ","order":"situations first, then claims (the subject's own maintained record, then site-wide corroborated clusters; each label ends with its standing), then co-mentions by shared documents, descending. Co-mentions are the ten strongest the entity graph keeps per entity"},"edge":{"state":"continues"},"links":{"rest":"/api/v1/node/e/df6d722246c6ca4cfb11b40b","mcp":"traverse {\"id\":\"sb:e/df6d722246c6ca4cfb11b40b\"}","page":"/entity/bess/"},"limits":{"levelsPerCall":1,"pageSize":10,"maxPageSize":50,"membersMax":50,"statement":"One level per call: depth is 1 and only 1, and there is no whole-graph dump. pageSize 1-50 (default 10); a page limit is a cursor, never an edge. Members are listed up to 50. At most 60 traverse calls a minute per caller (runaway-loop protection, not a meter). One knowledge cutoff is served: the deploy's."},"actions":[{"verb":"unfold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/df6d722246c6ca4cfb11b40b\",\"level\":\"children\"}"},{"verb":"fold","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/df6d722246c6ca4cfb11b40b\"}"},{"verb":"panOut","lit":false,"effect":"read","layer":"cantina","reason":"An entity is a root: it is contained by nothing. Pan out by following R."},{"verb":"follow","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/df6d722246c6ca4cfb11b40b\",\"level\":\"relations\"}"},{"verb":"receipts","lit":false,"effect":"read","layer":"cantina","reason":"receipts are the observations below this node; unfold to reach them"},{"verb":"edge","lit":true,"effect":"read","layer":"cantina","call":"traverse {\"id\":\"sb:e/df6d722246c6ca4cfb11b40b\"}"},{"verb":"asOf","lit":false,"effect":"read","layer":"cantina","reason":"v1 serves one knowledge cutoff, this deploy's; walking an earlier cutoff needs retained history (EQ-REPLAY), which v1 does not keep"},{"verb":"switchObserver","lit":false,"effect":"read","layer":"cantina","reason":"the public record is the same for every observer; traversal through a Watch's lens is not served in v1"},{"verb":"readOriginal","lit":false,"effect":"read","layer":"cantina","reason":"no translation is applied on this node; every label is the source's own text"},{"verb":"save","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"saving applies to a configured Watch; configure one around this node first (free), then save it"},{"verb":"deliver","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"delivery applies to a saved Watch"},{"verb":"format","lit":false,"effect":"watch-declaration","layer":"workshop","reason":"output format applies to a saved Watch"},{"verb":"deltaR","lit":false,"effect":"read","layer":"workshop","reason":"Delta R needs a saved Watch with a previous reading"},{"verb":"read","lit":false,"effect":"read","layer":"docking-bay","reason":"one-time Reads are parked until the Commander decides their shape (#938)"}]}